Jump to Navigation

JIG requirements are demanding a 100% slope. RoNik Inspectioneering 3D scanning and modelling are showing 0.5% accuracy.
Compositions of the floor and the wall of the floating roof tank attached are showing the areas of modification bringing the tank into JIG compliancy.



Main menu 2

Extra_informatie | by Dr. Radut